LINE Name Country City Regional Rail
M5 Phase 1 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2018 19.7 19.7 100% 16 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
866.0 USD 2.3 2015 1991.8 101.1 Media
REFERENCE http://www.uskudarumraniyecekmekoymetrosu.com/ana-sayfa/projenin-tarihcesi.aspx
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.