LINE Name Country City Regional Rail
M7 Phase 3 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2027 18.5 18.0 97% 11 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
896.3 USD 3.3 2020 2957.8 159.9 Plan
REFERENCE https://www.ibb.istanbul/Uploads/2019/10/1.-DOc.DR.PELiN-ALPKoKiN–RAYLI-SiSTEMLERiN-MEVCUT-DURUMU.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Istanbul city page.