LINE Name Country City Regional Rail
M9 TR Istanbul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2022 13.0 13.0 100% 12 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
386.7 USD 3.7 2020 1430.8 110.1 Plan
REFERENCE https://www.ibb.istanbul/Uploads/2019/10/1.-DOc.DR.PELiN-ALPKoKiN–RAYLI-SiSTEMLERiN-MEVCUT-DURUMU.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.