| LINE | Name | Country | City | Regional Rail | |||
| M1 (Phase 1) | TR | Izmir | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 1995 | 2000 | 11.6 | 3.4 | 29% | 10 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 600.0 | USD | 2.0 | 1998 | 1200.0 | 103.4 | Media | |
| REFERENCE | https://www.hurriyet.com.tr/ege/metroluyuz-39155285 | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Izmir city page. | |||||||