LINE Name Country City Regional Rail
M1 (Phase 1) TR Izmir No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1995 2000 11.6 3.4 29% 10 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
600.0 USD 2.0 1998 1200.0 103.4 Media
REFERENCE https://www.hurriyet.com.tr/ege/metroluyuz-39155285
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Izmir city page.