LINE Name Country City Regional Rail
M1 Phase 1 TR Izmir No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1995 2000 11.6 3.4 29% 10 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
600.0 USD 2.0 1998 1200 103.4 Media
REFERENCE https://www.hurriyet.com.tr/ege/metroluyuz-39155285
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.