LINE Name Country City Regional Rail
M3 to Vynohradar UA Kyiv No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2022 3.7 3.7* 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
5993.0** UAH 0.12 2020 725.2 196.0 Media
REFERENCE https://www.unian.info/kiev/10350087-kyiv-metro-signs-contract-for-subway-line-construction-to-kyiv-s-vynohradar-district.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* 2.4 by cut-and-cover http://metrobud.kiev.ua/main/eng/projects/works-in-progress/
** Caution: all available cost information predates a one-year delay.
Go to Kyiv city page.