LINE | Name | Country | City | Regional Rail | |||
M3 to Vynohradar | UA | Kyiv | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2018 | 2022 | 3.7 | 3.7* | 100% | 2 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
5993.0** | UAH | 0.12 | 2020 | 725.2 | 196.0 | Media | |
REFERENCE | https://www.unian.info/kiev/10350087-kyiv-metro-signs-contract-for-subway-line-construction-to-kyiv-s-vynohradar-district.html | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * 2.4 by cut-and-cover http://metrobud.kiev.ua/main/eng/projects/works-in-progress/ ** Caution: all available cost information predates a one-year delay. |
||||||
Go to Kyiv city page. |