LINE Name Country City Regional Rail
Line 1 Phase 1 CN Lanzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2016 26.6 26.6 100% 20 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
17160.0 CNY 0.28 2012 4818.9 181.2 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zdgc/201209/t20120905_1145859.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.