LINE | Name | Country | City | Regional Rail | |||
City Tunnel | DE | Leipzig | Yes | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2003 | 2013 | 3.6 | 3.6 | 100% | 4 | Wiki | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
960.0 | EUR | 1.3 | 2008 | 1248.0 | 346.7 | Plan | |
REFERENCE | http://dip21.bundestag.de/dip21/btd/17/029/1702939.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Leipzig city page. |