LINE | Name | Country | City | Regional Rail | |||
Line B to Oullins | FR | Lyon | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2009 | 2013 | 1.8 | 1.8 | 100% | 1 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
222.0 | EUR | 1.3 | 2011 | 288.6 | 160.3 | Media | |
REFERENCE | https://www.lyon-entreprises.com/actualites/article/le-prolongement-de-la-ligne-b-du-metro-lyonnais-a-oullins-devrait-booster-le-developpement-du-sud-ouest-lyonnais | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Lyon city page. |