LINE Name Country City Regional Rail
Line 9 extension ES Madrid No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2015 3.0 3.0 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
191.0 EUR 1.3 2012 248.3 82.8 Plan
REFERENCE https://web.archive.org/web/20150328212257/https://www.metromadrid.es/en/comunicacion/prensa/2015/March/noticia09.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.