LINE Name Country City Regional Rail
Lines 1-2 ES Malaga No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2006 2014 11.3 9.2 81% 17 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
870.0 EUR 1.3 2010 1131 100.1 Media
REFERENCE https://www.diariosur.es/20130217/local/malaga/obras-metro-malaga-costaran-201302170041.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.