LINE Name Country City Regional Rail
Blue Line extension CA Montreal No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2026 5.8 5.8 100% 5 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
4500.0 CAD 0.84 2018 3780 651.7 Media
REFERENCE https://montrealgazette.com/news/local-news/montreal-metro-green-light-for-blue-line-extension