LINE Name Country City Regional Rail
Line 10 IN Mumbai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2024 9.2 0.7 8% 4* Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
38210.0** INR 0.05 2018 1834.1 199.4 Plan
REFERENCE https://mmrda.maharashtra.gov.in/documents/10180/9283015/Metro+Line+10/076595c3-c882-424c-b49d-f22399e9a096
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* All elevated
** 44,760 in YOE rupees, mentioned e.g. at https://www.makaan.com/iq/news-views/all-about-mumbai-metro-line-10-11-and-12 and https://timesofindia.indiatimes.com/city/mumbai/mmrda-jurisdiction-to-expand-mumbai-metro-operations-corp-to-be-set-up/articleshow/66740043.cms