LINE Name Country City Regional Rail
U5 to Pasing DE Munich No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2022 2029 3.8 3.8 100% 3 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
988.0 EUR 1.35 2025 1333.8 351.0 Media
REFERENCE https://www.sueddeutsche.de/muenchen/muenchen-u-bahn-u5-pasing-kosten-1.5475070
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Munich city page.