LINE Name Country City Regional Rail
U3 extension DE Nuremberg No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2025 0.6 0.6 100% 1 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
137.5 EUR 1.3 2022 178.8 297.9 Media
REFERENCE https://www.nordbayern.de/region/nuernberg/trotz-corona-in-nurnbergs-untergrund-gehen-die-arbeiten-weiter-1.10063402
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.