LINE | Name | Country | City | Regional Rail | |||
U3 extension | DE | Nuremberg | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2020 | 2025 | 0.6 | 0.6 | 100% | 1 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
137.5 | EUR | 1.3 | 2022 | 178.8 | 297.9 | Media | |
REFERENCE | https://www.nordbayern.de/region/nuernberg/trotz-corona-in-nurnbergs-untergrund-gehen-die-arbeiten-weiter-1.10063402 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||