LINE Name Country City Regional Rail
Monorail extension JP Osaka No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2029 8.9 0.0 0% 4 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
105000.0 JPY 0.01 2019 1050.0 118.0 Plan
REFERENCE http://www.mlit.go.jp/common/001272230.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Osaka city page.