LINE Name Country City Regional Rail
Løren Line NO Oslo No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2016 1.6 1.6 100% 1 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1330.0 NOK 0.11 2014 142.3 88.9 Trade
REFERENCE https://www.railwaygazette.com/l%C3%B8renbanen-opens-in-oslo/42312.article
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Oslo city page.