| LINE | Name | Country | City | Regional Rail | |||
| Line 2 | PA | Panama City | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2015 | 2019 | 21.0 | 0.0 | 0% | 16 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 2130.0 | USD | 2.01 | 2017 | 4281.3 | 203.9 | Trade | |
| REFERENCE | https://www.railjournal.com/regions/central-south-america/panama-city-metro-line-2-inaugurated/ | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Panama City city page. | |||||||