LINE Name Country City Regional Rail
Line 8 to Pointe-du-Lac FR Paris No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2007 2011 1.3 0.0 0% 1 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
83.0 EUR 1.25 2005 103.8 79.8 Media
REFERENCE https://www.railpassion.fr/materiel-actualites-rp/011-14751-la-ligne-8-du-metro-arrive-a-creteil-pointe-du-lac/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Paris city page.