| LINE | Name | Country | City | Regional Rail | |||
| Line B | FR | Rennes | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2014 | 2021 | 14.0 | 11.0 | 79% | 15 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 1342.0 | EUR | 1.3 | 2020 | 1744.6 | 124.6 | Plan | |
| REFERENCE | http://www.presse.metropole.rennes.fr/accueil/documents-presse/tous-les-documents/27-10165/mise-en-service-de-la-ligne-b-du-metro-de-rennes-metropole-le-21-decembre-2020 | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Rennes city page. | |||||||