LINE | Name | Country | City | Regional Rail | |||
Green | SA | Riyadh | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2015 | 2016 | 12.9 | 12.0 | 93% | 11 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
2220.0 | USD | 1.82 | 2013 | 4040.4 | 313.2 | Trade | |
REFERENCE | https://www.fastmetroriyadh.com/ar/%d8%a7%d9%84%d8%ae%d8%b1%d9%8a%d8%b7%d8%a9-2/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Riyadh city page. |