| LINE | Name | Country | City | Regional Rail | |||
| Yellow | SA | Riyadh | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2014 | 2020 | 29.6 | 0.0 | 0% | 8 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 2270.0 | USD | 1.82 | 2013 | 4131.4 | 139.6 | Trade | |
| REFERENCE | https://www.fastmetroriyadh.com/about/our-lines/ | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Riyadh city page. | |||||||