LINE Name Country City Regional Rail
Line C – section T3 IT Rome No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2023 2.7 2.7 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
861.0 EUR 1.3 2018 1119.3 414.6 Plan
REFERENCE https://metrocspa.it/cms/wp-content/uploads/2016/12/2-Q.E.G.-12-set-2013.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Rome city page.