LINE Name Country City Regional Rail
Lines 1-2 BR Salvador No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2000 2017 33.0 1.4 4% 20 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
4800.0 BRL 0.62 2012* 2976.0 90.2 Media
REFERENCE http://patrocinados.estadao.com.br/ccr/salvadors-subway-becomes-a-model-of-success/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Weighted toward the end because most actual construction happened starting 2013.
Go to Salvador city page.