LINE Name Country City Regional Rail
U-Link US Seattle No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2016 5.1 5.1 100% 2 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1756.0 USD 1.0 2012 1756 344.3 Plan
REFERENCE https://www.soundtransit.org/sites/default/files/documents/2018-q3-link-light-rail_0.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.