LINE Name Country City Regional Rail
Line 12 Phase 2 CN Shenzhen No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
not start 8.05 8.05 100% 6 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
9094.0 CNY 0.24 2020 2166.2 269.1 Media
REFERENCE https://huacheng.gz-cmc.com/pages/2020/09/02/12217064331742859f82edec5e61f9ff.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.