LINE Name Country City Regional Rail
Line 13 CN Shenzhen No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2023 23.0 23.0 100% 14 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
21480.0 CNY 0.24 2017 5133.8 223.2 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201707/W020190905497930956563.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Shenzhen city page.