LINE Name Country City Regional Rail
Line 3 Phase 4 CN Shenzhen No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2022 9.35 7.42 79% 7 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
10785.0 CNY 0.24 2020 2569.0 274.8 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201707/W020190905497930956563.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.