LINE Name Country City Regional Rail
Thomson MRT Line SG Singapore No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2014 2024 43.0 43.0 100% 32 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
25000.0 SGD 1.13 2019 28250.0 657.0 Media
REFERENCE https://www.straitstimes.com/singapore/transport/thomson-east-coast-line-6-more-stations-from-springleaf-to-caldecott-opening
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Singapore city page.