LINE Name Country City Regional Rail
Line 1 northern BG Sofia No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2012 5.1 3.1 60% 4 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
407.0 BGN 1.69 2010 854.7 167.6 Media
REFERENCE https://www.novinite.com/articles/167648/Subway+Trains+to+Sofia+Airport+Start+Running+at+1+pm+on+April+2
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.