LINE Name Country City Regional Rail
Line 2 extension BG Sofia No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2012 2016 1.3 1.3 100% 1 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
21.0 EUR 3.32 2014 79.8 61.4 Media
REFERENCE https://seenews.com/news/sofia-subway-launches-13-km-section-with-one-station-533330
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Sofia city page.