LINE Name Country City Regional Rail
Line 2 BG Sofia No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2008 2012 17.0 15.3 90% 11 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
952.0 EUR 3.32 2010 3,927.6 231.0 Trade
REFERENCE https://www.railway-technology.com/uncategorised/newsbulgaria-opens-sofia-metro-line-2/
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Sofia city page.