LINE Name Country City Regional Rail
Line 7 CN Suzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
27.0 27.0 100% 23 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
18560.0 CNY 0.24 2018 4414.8 163.5 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201809/W020190905497960329280.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.