LINE Name Country City Regional Rail
Airport MRT TW Taipei No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2006 2017 51.0 10.7 21% 22 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
113850.0 TWD 0.07 2011 7559.6 148.2 Media
REFERENCE https://www.straitstimes.com/asia/east-asia/taipei-airport-rail-line-ready-to-roll
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Taipei city page.