LINE | Name | Country | City | Regional Rail | |||
Circular Line first section | TW | Taipei | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2011 | 2020 | 15.4 | 1.1 | 7% | 14 | Measured* | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
69970.0** | TWD | 0.07 | 2015 | 4646.0 | 301.7 | Media | |
REFERENCE | https://www.taiwannews.com.tw/en/news/3861624 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Underground length is measured, the rest comes from the popular and trade media. ** See also http://www.taipeitimes.com/News/taiwan/archives/2019/10/27/2003724736 |
||||||
Go to Taipei city page. |