LINE | Name | Country | City | Regional Rail | |||
Main line | GR | Thessaloniki | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2006 | 2020 | 9.5 | 9.5 | 100% | 13 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1112.0* | EUR | 1.3 | 2014 | 1445.6 | 152.2 | Plan | |
REFERENCE | https://omekgroup.com.gr/projects/thessaloniki-metro/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * P. 5 of https://www.ametro.gr/wp-content/uploads/2018/08/AM_Xrimatooikonomikes_katastaseis_2017.pdf says 1,283.7 including rolling stock. |
||||||
Go to Thessaloniki city page. |