LINE Name Country City Regional Rail
Main line GR Thessaloniki No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2006 2020 9.5 9.5 100% 13 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1112.0* EUR 1.3 2014 1445.6 152.2 Plan
REFERENCE https://omekgroup.com.gr/projects/thessaloniki-metro/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* P. 5 of https://www.ametro.gr/wp-content/uploads/2018/08/AM_Xrimatooikonomikes_katastaseis_2017.pdf says 1,283.7 including rolling stock.
Go to Thessaloniki city page.