LINE Name Country City Regional Rail
M7 Phase 1 CN Tianjin No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2020 26.9 26.9 100% 24 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
25704.0 CNY 0.26 2015 6640.1 246.8 Media
REFERENCE https://wenku.baidu.com/view/801ab19a8ad63186bceb19e8b8f67c1cfbd6ee6e.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.