LINE Name Country City Regional Rail
Scarborough CA Toronto No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2030 7.8 7.8 100% 3 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
5500.0 CAD 0.84 2018 4620.0 592.3 Media
REFERENCE https://urbantoronto.ca/news/2020/03/metrolinxs-preliminary-business-case-scarborough-subway-extension-raises-questions
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.