LINE Name Country City Regional Rail
Sheppard CA Toronto No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1994 2002 5.5 5.5 100% 5 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1000.0 CAD 0.81 1998 810.0 147.3 Media
REFERENCE https://www.theglobeandmail.com/news/toronto/sheppard-subway-extension-a-quarter-the-stops-for-three-times-the-cost/article622366/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.