LINE Name Country City Regional Rail
Vaughan CA Toronto No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2017 8.6 8.6 100% 6 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3200.0 CAD 0.81 2013 2592.0 301.4 Media
REFERENCE https://www.thestar.com/news/gta/transportation/2017/12/15/trudeau-wynne-tory-on-hand-to-cut-ribbon-on-32-billion-subway-extension.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.