LINE Name Country City Regional Rail
Line 2 -phase 1-2 IT Turin No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2024 2030 9.4 9.4 100% 13 plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1828.0* EUR 1.3 2020 2376.4 252.8 plan
REFERENCE https://www.infrato.it/wp-content/uploads/2022/01/2022_1_Presentazione-Linea-2.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* this number includes trains too…
maybe we can skip from the database
-Marco Chitti
Go to Turin city page.