CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2022 4.0 4.0 100% 3 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1,400.0 PLN 0.57 2020 837.0 209.2 Trade
REFERENCE https://www.railwaypro.com/wp/a-single-bidder-for-warsaw-metro-line-2-extension/
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.