LINE Name Country City Regional Rail
Line 2 extension to KJ PL Warsaw No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2015 2020 3.4 3.4 100% 3 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1,148.0* PLN 0.58 2017 731.0 215.0 Trade
REFERENCE https://www.railwaygazette.com/metros/warszawa-metro-line-m2-goes-west/56191.article
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* 1100 per https://www.railjournal.com/passenger/metros/warsaw-opens-3-4km-line-m2-extension/