LINE | Name | Country | City | Regional Rail | |||
Line 2 extension to KJ | PL | Warsaw | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2015 | 2020 | 3.4 | 3.4 | 100% | 3 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1,148.0* | PLN | 0.58 | 2017 | 731.0 | 215.0 | Trade | |
REFERENCE | https://www.railwaygazette.com/metros/warszawa-metro-line-m2-goes-west/56191.article | ||||||
NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * 1100 per https://www.railjournal.com/passenger/metros/warsaw-opens-3-4km-line-m2-extension/ |
||||||