LINE | Name | Country | City | Regional Rail | |||
Line 2 | PL | Warsaw | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2010 | 2015 | 6.5 | 6.5 | 100% | 7 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
5,900.0* | PLN | 0.56 | 2012 | 3,878.5 | 596.7 | Trade | |
REFERENCE | https://www.railwaygazette.com/news/single-view/view/warszawa-opens-second-metro-line.html | ||||||
NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Including rolling stock. |
||||||