LINE Name Country City Regional Rail
Line 2 PL Warsaw No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2010 2015 6.5 6.5 100% 7 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
5,900.0* PLN 0.56 2012 3,878.5 596.7 Trade
REFERENCE https://www.railwaygazette.com/news/single-view/view/warszawa-opens-second-metro-line.html
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Including rolling stock.
Go to Warsaw city page.