LINE Name Country City Regional Rail
Silver Line Phase 1 US Washington No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2014 18.8 0.7 4% 5 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2982.0 USD 1.0 2011 2982.0 158.6 Plan
REFERENCE http://www.dullesmetro.com/about-dulles-rail/funding/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.