LINE Name Country City Regional Rail
Line 3 Phase 2 CN Xuzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
4 years 6.5 6.5 100% 5 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
5015.4 CNY 0.24 2020 1194.7 183.8 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/tz/202002/P020200210345113822478.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.