LINE Name Country City Regional Rail
Line 3 Phase 2 CN Zhengzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
6.3 6.3 100% 4 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3800.9 CNY 0.24 2019 905.4 143.6 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201904/W020190910670741123314.pdf; https://4g.dahe.cn/news/20191106554486
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.