LINE Name Country City Regional Rail
Line 3 Phase 2 CN Zhengzhou No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
6.1 6.1 100% 4 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3746.0 CNY 0.24 2019 892.3 146.3 Plan
REFERENCE https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201904/W020190910670741123314.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Zhengzhou city page.