| LINE | Name | Country | City | Regional Rail | |||
| Durchmesserlinie | CH | Zurich | Yes | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2007 | 2014 | 9.6 | 4.8 | 50% | 1 | Trade | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 2030.0 | CHF | 0.68 | 2010 | 1380.4 | 143.8 | Trade | |
| REFERENCE | https://www.railwaygazette.com/infrastructure/cross-city-tunnel-opening-increases-capacity-in-zurich/39619.article | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Zurich city page. | |||||||