LINE Name Country City Regional Rail
Durchmesserlinie CH Zurich Yes
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2007 2014 9.6 4.8 50% 1 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2030.0 CHF 0.68 2010 1380.4 143.8 Trade
REFERENCE https://www.railwaygazette.com/infrastructure/cross-city-tunnel-opening-increases-capacity-in-zurich/39619.article
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Zurich city page.