| LINE | Name | Country | City | Regional Rail | |||
| Line 8 Phase 1 | CN | Chengdu | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2016 | 2020 | 27.4 | 27.4 | 100% | 22 | Plan | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 21863.0 | CNY | 0.25 | 2016 | 5480.8 | 200.0 | Plan | |
| REFERENCE | https://www.ndrc.gov.cn/fggz/zcssfz/zdgc/201607/t20160715_1146086.html | ||||||
| NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Chengdu city page. | |||||||